Daily debugging and maintenance of cable tray equipment
- 2023-12-29
- 189
- Qingdao Sunmach Intelligent Equipment Technology Co., Ltd.
1.When the steel coil is hoisted on the feeder of the bridge equipment, it shall not stand under the steel coil.When the steel coil is in quick contact with the loading frame, one person from the left and right side will work together to drive the vehicle and concentrate the steel coil on the loading frame of the cable bridge equipment.
2.Before the cable bridge equipment is out, the punching tissue should be the first empty test run,Check the cylinder into and out, block and reset the blocking device correctly.
3.Before starting bridge equipment, pay attention to the chain cover. When starting the bridge equipment, do not put your hand into the pinch roller to avoid accidents.
4.After the debugging of the whole automatic plate cover machine, it should be empty test run first, and it can be tested and produced after normal operation.
5. When testing or producing cable tray equipment, it is forbidden to use plates with defects or rolling phenomena on the head and edge to avoid damaging the cable tray equipment.